EATON G Series Molded Case Circuit Breaker Trip Units, JT Frame | Raptor Supplies United Kingdom
We are closed from Monday, Dec 23rd and will reopen on Monday, Jan 6th. Any orders received during this time will be processed in the New Year.
Sign In

EATON G Series Molded Case Circuit Breaker Trip Units, JT Frame

Eaton G Series MCCB trip units are used in conjunction with JT-frame MCCBs for protecting electrical systems and equipment from overcurrent or short circuit faults.

Filter
StyleModelPrice
A
JT2125FA
£1,134.52
B
JT3125AA
£2,473.85
B
JT3175FA
£1,916.72
A
JT2200FA
£1,134.52
B
JT3080AA
£2,473.85

Features

  • They have two / three poles for enhanced current overload protection.
  • These trips unit feature JT frames for improved reliability.

Standards and Approvals

  • IEC
  • UL
  • CSA
  • CE

Frequently Asked Questions

How to maintain these trip units?

  • Before starting any maintenance activity, ensure that the circuit breaker is in the off position and that the power source is disconnected.
  • Inspect the trip unit regularly for any signs of damage, such as cracks, chips or discolouration. If any damage is found, replace the trip unit immediately.
  • Clean the trip unit regularly to remove any dust or debris that may have accumulated on it. Use a soft brush or compressed air to clean the unit, taking care not to damage any of the components.
  • Check the calibration of the trip unit regularly to ensure that it is functioning within the manufacturer's specifications. This can be done using a specialised testing tool or by consulting the manufacturer's documentation.
  • Inspect the wiring and connections to the trip unit regularly to ensure that they are secure and free from corrosion.

How to install Eaton G Series MCCB trip units?

  • Ensure that the power supply to the MCCB is disconnected and that the breaker is in the off position.
  • Remove the cover of the MCCB to access the trip unit.
  • Carefully remove the old trip unit by disconnecting the wires and loosening any retaining screws or clips.
  • Install the new trip unit by aligning it with the mounting brackets and securing it in place with retaining screws or clips.
  • Connect the trip unit to the appropriate terminals of the MCCB, following the manufacturer's instructions and using the appropriate tools.
  • Verify that the trip unit is securely and correctly installed by conducting a visual inspection of the connections and wires.
  • Replace the cover of the MCCB and secure it in place.
  • Restore the power supply to the MCCB and test the trip unit to ensure that it is functioning properly.
  • Finally, keep a record of the installation and any adjustments made to the trip unit for future reference.

We are here to help!

Looking for a part not listed here?