EATON DR2 Series Line Reactors | Raptor Supplies United Kingdom
We are closed from Monday, Dec 23rd and will reopen on Monday, Jan 6th. Any orders received during this time will be processed in the New Year.
Sign In

EATON DR2 Series Line Reactors

Eaton DR2 Series line reactors are electrical components installed in the power line between the power source and the load to protect sensitive equipment from voltage spikes and electrical noise that can occur in the power line.

Filter
StyleModelPrice
A
DR2-2600-13
£12,324.46
A
DR2-51D0-13
£752.94
A
DR2-5080-13
£2,399.84
A
DR2-5130-05
£3,580.42
A
DR2-5130-03
£2,354.34
A
DR2-5130-13
£2,989.00
A
DR2-5100-03
£1,772.00
A
DR2-5100-13
£2,379.36
A
DR2-5160-03
£3,380.24
A
DR2-5100-05
£3,555.40
A
DR2-51D0-03
£350.31
A
DR2-5130-15
£4,274.21
A
DR2-51D0-05
£363.96
A
DR2-5250-13
£4,474.39
A
DR2-5080-05
£3,145.95
A
DR2-5160-05
£3,958.02
A
DR2-5160-15
£4,663.19
A
DR2-51D0-15
£764.31
A
DR2-52D0-03
£384.44
A
DR2-5160-13
£4,060.39
A
DR2-52D0-05
£402.62
A
DR2-5200-13
£3,521.28
A
DR2-5200-15
£5,168.18
A
DR2-52D0-13
£784.79
A
DR2-5250-15
£8,050.25
A
DR2-5400-15
£9,535.66
A
DR2-5100-15
£4,242.36
A
DR2-5045-15
£2,088.19
A
DR2-54D0-03
£400.35
A
DR2-2500-05
£9,153.50
A
DR2-2100-15
£2,379.36
A
DR2-22D0-03
£475.41
A
DR2-21D0-15
£752.94
A
DR2-2160-13
£2,900.27
A
DR2-5850-15
£20,695.47
A
DR2-24D0-05
£400.35
A
DR2-5750-15
£22,756.37
A
DR2-2400-15
£8,218.59
A
DR2-58D0-15
£1,037.27
A
DR2-24D0-13
£791.60
A
DR2-2500-15
£13,648.37
A
DR2-2750-15
£17,424.40
A
DR2-4035-03
£777.96
A
DR2-2600-15
£14,778.91
A
DR2-2750-05
£12,752.13
A
DR2-2750-13
£14,660.62
A
DR2-28D0-15
£805.25
A
DR2-4018-03
£641.46
A
DR2-4012-05
£732.46
A
DR2-4018-15
£1,405.77
A
DR2-4025-15
£1,530.89
A
DR2-4018-05
£850.74
A
DR2-4055-15
£2,381.64
A
DR2-4045-03
£1,173.77
A
DR2-52D0-15
£809.81
A
DR2-5400-13
£8,218.59
A
DR2-42D0-05
£402.62
A
DR2-4750-15
£22,756.37
A
DR2-2080-05
£1,803.86
A
DR2-2130-03
£1,790.21
A
DR2-21D0-05
£350.31

Features

  • They have current ratings up to 1000A and voltage ratings ranging from 208 to 600V.
  • These line reactors have a compact footprint for easy installation and space-saving.
  • They feature copper windings for high conductivity and laminated steel core construction for enhanced durability.

Standards and Approvals

  • UL

Frequently Asked Questions

How to maintain these line reactors?

  • Keep the reactors clean by using a soft cloth or brush to remove any dirt or debris.
  • Inspect the reactors regularly for signs of wear or damage, including physical and electrical damage.
  • Check the connections to the reactors periodically to ensure they are tight and secure.
  • Conduct regular electrical testing of the reactors, such as insulation resistance testing and continuity testing.
  • Replace damaged reactors as soon as possible to ensure safe and reliable operation of the electrical system.

How to clean these line reactors?

  • Turn off the power supply to the reactor.
  • Remove any covers or panels that may be covering the reactor.
  • Use a soft cloth or brush to gently remove any dirt or debris from the surface of the reactor.
  • Avoid using abrasive materials or harsh chemicals that could damage the reactor.
  • Inspect the reactor for any signs of damage or wear.
  • If necessary, use a non-corrosive cleaner and a soft cloth to remove any stubborn dirt or debris.
  • Once the cleaning is complete, replace any covers or panels that were removed and turn the power supply back on.

How to install Eaton DR2 Series line reactors?

  • Turn off the power supply to the equipment or system where the line reactor will be installed.
  • Determine the appropriate location for the line reactor based on the electrical specifications and requirements of the system.
  • Mount the line reactor securely in place using any provided mounting hardware.
  • Connect the electrical wires to the line reactor using proper wiring and connection methods and ensure all connections are tight & secure.
  • Double-check all connections and wiring to ensure they are properly installed and free from damage or wear.
  • Turn the power supply back on and test the system to ensure that the line reactor is functioning properly and there are no electrical issues or safety hazards.

We are here to help!

Looking for a part not listed here?